Skip to the content

Lesson 273 of 296

Teamwork: pull requests, code review and Agile

What you will learn

  • How professional teams get code from idea to production
  • Good pull requests: size, description, commits
  • Giving and receiving code reviews
  • Agile, Scrum and Kanban in plain words
  • Estimation, definition of done and technical debt
  • Working well in a team (including remotely)
On this page

The everyday flow

  1. A ticket (user story or bug) describes the need and acceptance criteria.
  2. You create a branch from main (Lesson 92), implement in small commits, and write tests.
  3. You open a pull request (PR); CI runs automatically (Lesson 251).
  4. Teammates review; you respond and update.
  5. The PR is merged, deployed, and verified in production.

Good pull requests

PracticeWhy
Small (often under about 400 changed lines)Reviewers find more problems in small PRs and review them faster; big PRs get rubber-stamped
One purposeDo not mix a refactor, a feature and a formatting change
Clear descriptionWhat and why, how to test, screenshots for UI, risks, links to the ticket
Self-review firstRead your own diff before asking others; remove debug code
Tests and passing CIReviewers should not find what CI could
Meaningful commitsAdd VAT rounding per invoice line rather than fix stuff; many teams use Conventional Commits (feat:, fix:, refactor:)
Feature flags for unfinished workMerge small pieces early without exposing them (Lesson 251)

Large features become a series of small PRs (database migration, then API, then UI behind a flag).

Code review

Goals: catch bugs and security problems, keep the code consistent and maintainable, share knowledge across the team, and mentor.

As a reviewer:

  • Review promptly; a PR waiting days blocks a teammate.
  • Look first at the important things: correctness, edge cases, security (Part 20), data integrity, tests, naming and design. Leave style to the formatter and linter.
  • Be kind and specific; comment on the code, not the person. Ask questions: "What happens if the list is empty?" rather than "This is wrong."
  • Label comments: blocking vs nit (minor, optional) vs question vs praise for good work.
  • Suggest concrete alternatives; approve when it is good enough, not perfect.

As an author:

  • Assume good intent; reviews are about the code.
  • Respond to every comment: change it, or explain why not.
  • Discuss large disagreements in a call rather than long comment threads, then record the decision.

Agile in plain words

Agile is a way of working that delivers software in small increments, gets feedback early and often, and adapts to change instead of following a fixed long plan (the opposite of "waterfall"). The 2001 Agile Manifesto values individuals and interactions, working software, customer collaboration and responding to change.

Scrum, the most common Agile framework:

ElementMeaning
SprintA fixed time box, often two weeks, producing a usable increment
Product backlogOrdered list of work, owned by the Product Owner
Sprint planningThe team chooses backlog items for the sprint and plans how
Daily stand-up (daily scrum)15 minutes: progress, plan for today, blockers
Sprint reviewDemonstrate the increment to stakeholders; gather feedback
RetrospectiveThe team discusses how to work better: keep, stop, start
Scrum MasterFacilitates the process and removes impediments

Kanban: a continuous flow instead of sprints; work moves across columns on a board (To do, In progress, Review, Done) with work-in-progress (WIP) limits to avoid starting too much and finishing little. Common for support, operations and small teams. Many teams use a hybrid.

User stories, estimation and done

  • User story: "As a customer, I want to save my card so that checkout is faster", with acceptance criteria (often Given/When/Then, Lesson 272).
  • Estimation: story points (relative size and complexity, often Fibonacci numbers 1, 2, 3, 5, 8) or simply counting small items; planning poker gathers estimates from everyone to surface different assumptions. Estimates are for planning, not promises.
  • Definition of Done: a shared checklist: code reviewed, tests written and passing, documentation updated, deployed to staging, acceptance criteria met, monitoring in place.

Technical debt

Technical debt is the future cost of shortcuts and outdated code: like financial debt, small amounts can be sensible to ship quickly, but the "interest" (slower changes, more bugs) grows if never repaid. Good practice: make debt visible (tickets), pay it down continuously (a share of each sprint, the Boy Scout rule), and explain it to non-technical people in terms of risk and speed.

Working well in a team

  • Communicate early, especially about blockers and risks; "I'm stuck on X, I've tried Y" after a reasonable time, not after three days.
  • Write things down: decisions (architecture decision records), how-to guides, PR descriptions.
  • In remote and hybrid teams: clear asynchronous messages with context, overlapping hours for pairing, cameras on for important discussions, written summaries after calls.
  • Pair programming and mob programming spread knowledge and are common for onboarding and tricky problems.
  • Blameless post-mortems after incidents focus on fixing systems, not blaming people.

How to say it in an interview

"I work ticket by ticket on short-lived branches, opening small, single-purpose pull requests with a clear description of what and why, tests and passing CI, and I self-review before asking others. When reviewing I respond quickly, focus on correctness, security, tests and design rather than style, which tools handle, and give kind, specific comments marked as blocking or nits. I have worked in Agile teams with Scrum sprints, stand-ups, reviews and retrospectives, and with Kanban boards and WIP limits; I write user stories with acceptance criteria, follow a definition of done, keep technical debt visible and communicate blockers early."

Key words

WordMeaning
Pull requestA proposed change reviewed before merging
Code reviewTeammates checking code before it is merged
NitA minor, optional review comment
AgileDelivering in small increments with frequent feedback
Scrum / sprintA framework with fixed time boxes / one such time box
Stand-up / retrospectiveDaily sync / reflection on how to improve
Kanban / WIP limitContinuous flow board / cap on work in progress
User story / acceptance criteriaA need from a user's view / conditions for done
Definition of DoneShared checklist for finished work
Technical debtFuture cost of shortcuts

Now prove it

This lesson is complete when you pass the quiz and all three practice levels.